The inspection report lands two days before the container is booked. The inspector sampled 125 pieces from a 2,400-piece lot and found four major defects. The lot passed against AQL 2.5. The buyer divides four by 125 and asks how that passes a 2.5 standard.

The two numbers are not the same kind of number. One counts defects in a sample; the other is a level a plan is indexed to. Confusing them is the most common mistake.

This page is about setting the plan: level, sample size, accept numbers. Reading the report is covered in how to read an AQL inspection report.

What AQL inspection measures

AQL inspection is acceptance sampling. A fixed number of units is drawn from a lot and checked against an agreed defect classification, and the lot is accepted or rejected by comparing the defect count with a pre-set accept number. The AQL is the level that plan is indexed to.

The standards behind it were written for a continuing series of lots from one supplier, not for one shipment. ISO 2859-1 is the reference most buyers cite, and the plan describes the process average those lots keep hitting.

What it is not: a defect-rate allowance, a share of the order you may ship as seconds, or a substitute for a specification.

Levels, sample sizes and accept numbers

Three general levels exist. Level II is the default for apparel. Level I samples less, level III samples more and appears on first orders, and S-1 to S-4 cover destructive or very large lots.

The level changes the sample size and, through it, the accept number, but not the AQL label. Two suppliers quoting AQL 2.5 can run plans that differ by a factor of two.

Sample size is read off the lot, not chosen. At level II it runs like this.

  • 281–500 units: 50 pieces, accept 3.
  • 501–1,200 units: 80 pieces, accept 5.
  • 1,201–3,200 units: 125 pieces, accept 7.
  • 3,201–10,000 units: 200 pieces, accept 10.
  • 10,001–35,000 units: 315 pieces, accept 14.

The number that decides the lot is the accept number, not the AQL.

Critical, major, minor

Each class runs its own plan. A critical defect rejects the lot on its own. Majors would stop a sale or break the specification; minors would be noticed and still sold through.

Class Typical knit examples Common AQL Ac at n=200 Consequence
Critical Sharp or broken needle fragment, choke hazard on trims, wrong fibre or care statement 0 0 Rejected on a single finding
Major Hole, ladder, measurement outside tolerance, visible shade band, open seam 2.5 10 Rejected at 11 findings
Minor Untrimmed thread, loose button thread, slight pilling, measurement at the limit 4.0 14 Rejected at 15 findings

In knitwear the split matters more than in woven goods, because a fault travels. A dropped stitch is one stitch at the needle and a ladder thirty rows later.

Class AQLs are negotiated: 0 / 2.5 / 4.0 is a convention, and some buyers run majors at 1.5. Classes and limit samples are agreed before the inspection, not after. Our categories are in the knitwear defect classification.

Not everything is an attribute: flammability under 16 CFR 1610 is a specimen test, and so are fibre content and restricted substances.

Why AQL 2.5 is not 2.5% defects

Take the 2,400-piece lot. Two and a half percent of it is 60 units, and no number in the plan counts to 60. The plan counts defective units in a 125-piece sample against 7: accepted at 7, rejected at 8.

Now divide. Seven out of 125 is 5.6%. Set the accept number against the sample size and the practical line sits between five and six percent. A lot at 5% defective can pass.

Sampling risk runs both ways. A lot whose true rate sits at 2.5% still fails sometimes, because the plans aim at high probability of acceptance, not certainty. A process far above the AQL can also pass one inspection.

So read the AQL as two things: the process average a supplier is expected to hold across lots, and the index that selects an accept number for one lot. A clause reading 2.5% maximum defective cannot be inspected.

The lot is judged on the sample, not on the order.

Who draws the sample, and when

The sample must come from the whole lot, drawn by someone with no interest in which units get picked. Every carton should be available, and the carton numbers go on the report.

When the factory chooses the cartons, the inspection measures what the factory chose to show. That is usually not dishonesty, but it biases the result. The inspector should pick from a list.

Independence is the other half. Factory QC and a third-party company produce documents of different weights, and so does the buyer’s own agent. Name the signing party.

Rows of flat-bed knitting machines with part-finished panels, the stage where an inline check catches a gauge or shade fault early
An inline check at the first bulk output catches a fault while it is still a setting.

Final inspection is a gate: it accepts or rejects the lot at the last point where rework is possible. Inline inspection happens during production, when a systematic fault is still cheap to fix. AQL lot acceptance is meaningless on a half-finished lot, and inline versus pre-shipment inspection covers where that check sits.

Writing AQL into the PO

Most AQL disputes are drafting failures.

The order needs enough detail that two inspectors reach the same verdict, and the counting rule belongs in it. Three faults on one garment can be one nonconforming unit or three nonconformities.

Five points do most of the work.

  • The standard and sampling type. ISO 2859-1, single sampling, normal inspection.
  • The inspection level. General level II, written in the clause rather than assumed.
  • The AQL by class. Each class gets its own number, with critical at zero.
  • Who, where, when. Named party, factory premises, after 100% packing, full quantity.
  • Definitions and consequence. Classes, limit samples, the counting rule, who pays for a sort.
Finished knit polo shirts on a rail in the packing area, the state a lot should be in when the sample is drawn
A sample drawn before packing measures something else.

Two additions matter. Require batch marking, so a screened lot cannot be confused with a reworked one at the dock; in the EU, traceability comes from the General Product Safety Regulation. Then pin the label checks: care wording per 16 CFR 423 and ISO 3758, fibre statements per the FTC rules and Regulation 1007/2011.

Our final inspections run at AQL 2.5, general level II, on orders from 300 pieces. Send your draft clause and we will mark up what can and cannot be inspected.

FAQ

Does AQL 2.5 mean 2.5% of the order can be defective?

No. The 2.5 indexes a sample size and an accept number for the lot. At level II a 2,400-piece lot is judged on 125 pieces against an accept number of 7. The lot passes or fails on that count.

Is a passed inspection a guarantee that the order is clean?

No. A sample of 125 units from 2,400 cannot prove every unit. A passed lot means the sample’s defect count sat at or below the accept number. Defects in cartons the sample missed will not appear.

Should we use AQL 1.5 instead of 2.5?

It depends on what a defect costs you. A 1.5 plan tightens the accept number at the same sample size, so more lots fail and more rework happens; for basic knit tops, 2.5 with a clear major list works.