Six styles, one page, and the buyer spends four minutes on it. In those four minutes they decide whether to ask for samples, ask for prices, or move to the next supplier. Most line sheets lose that meeting before the first question, because they are built like a lookbook: beautiful images, no numbers.
A line sheet is a buying document. It exists so a wholesale buyer can build an order without emailing you three times, and so you can quote a range without re-checking every style.
What a buyer actually needs from one page
The standard fields are boring, and that is the point. A buyer comparing four suppliers will line up the same columns for each of them; anything missing becomes a reason to deprioritise you.
| Field | Why the buyer needs it | What goes wrong when it is missing |
|---|---|---|
| Style number and name | Reference for every later email and PO | Orders arrive with descriptions instead of codes |
| Image, front and detail | Visual check against the range plan | Buyer cannot picture the garment next to their other buys |
| Fabric and composition | Sell-through depends on hand-feel and care | Returns and complaints later, or a rejected sample |
| Colours offered | Range building and colour stories | “Do you have it in navy?” consumes the meeting |
| Size range | Fit and stock planning | Buyer assumes XS–XL and orders wrong |
| Wholesale price | Margin calculation, immediately | The meeting ends without a number |
| Suggested retail price | Keystone check; positions the brand | Buyer guesses and undervalues the line |
| MOQ per style or colour | Order feasibility | Buyer builds a range you cannot produce |
| Lead time and delivery window | Floor-set dates | Commitments made against a date you cannot hit |
The numbers that decide the meeting
Three numbers do most of the work: wholesale price, suggested retail, and minimum order. If the buyer cannot compute margin in their head, the line sheet has failed.
- Wholesale price per style, per colour where it differs.
- Suggested retail that implies a sensible multiple. A 2.2× multiple is a common wholesale convention; below 2× the retailer has no room, above 3× the price looks speculative.
- MOQ stated per style and, if relevant, per colour. “300 pcs per style” is a number a buyer can plan against; “flexible” is not.
If your production has a published starting minimum of 300 pieces per style, put it on the sheet. Hiding it until the order conversation wastes both sides’ time, and the buyer who needs 120 pieces learns it late.

One page per style, or one page per range?
Both exist, and they do different jobs. A range sheet (6–12 styles on one page) is for the first meeting: it shows the story and the price architecture. A style sheet (one page per style) is for the order: it carries the detail a buyer needs to place and repeat.
| Format | Use it for | Keep it to |
|---|---|---|
| Range sheet | First contact, trade shows, showroom | 8–12 styles, one image each, price and MOQ |
| Style sheet | Order confirmation, reorders | One style, full spec, colour and size breakdown |
| Colour card | Seasonal colour story | Pantone references with lab-dip status |
The mistakes that lose the order
- No prices. A line sheet without a wholesale price is a lookbook. The buyer will ask, and you will lose a day.
- Too many styles. Twelve well-chosen styles beat forty that show no point of view; buyers buy ranges, not catalogues.
- No MOQ. The buyer plans an order you cannot produce, then has to re-plan, and the re-plan is where you get dropped.
- Lead time as a single number. “30 days” without a start trigger (sample approval? yarn arrival?) is not a commitment, it is a hope.
- Photography that hides the garment. A model shot at an angle is fine for social; for a line sheet the buyer needs front, back and a detail.
- No delivery window. Retailers work to floor-set dates; “we will confirm” means “we are not planned”.
How the sheet connects to production
The line sheet is downstream of your tech pack, not a separate document. Every field that appears on it — composition, size range, colour, MOQ, lead time — should already exist in the production file. When the two disagree, the buyer sees the line sheet and the factory builds the pack, and the gap becomes a claim.
That is why the sheet should be generated from the same data as the tech pack. Our manufacturing services page describes the approval gates where those numbers get fixed, and the collection overview shows how styles are grouped for range building.
A workable structure for the range sheet
| Block | Content | Size on page |
|---|---|---|
| Header | Brand, season, contact, date, version | One line |
| Grid | Style number, image, name, composition, colours, sizes, wholesale, retail, MOQ | 70% of the page |
| Footer | Lead time, delivery window, order deadline, payment terms | Three lines |
Keep the version number on the sheet. A buyer who built an order against v2 will notice when v3 changes a price, and they will trust the next sheet more, not less.
FAQ
Is a line sheet the same as a lookbook?
No. A lookbook sells the mood; a line sheet sells the order. They can share photography, but the line sheet must carry prices, MOQ and lead times.
How many styles should a first line sheet have?
Six to twelve is a workable range for a first season. Enough to show a point of view, few enough that each style can be produced and reordered properly.
Should I show retail prices?
Yes, as a suggested retail. It tells the buyer where you position the brand and lets them check margin without asking. Mark it as suggested, not fixed.
Can a factory produce a line sheet for us?
It can supply the production facts — composition, MOQ, lead time — and many factories will lay them out. The pricing, positioning and range edit are brand decisions and should stay with you.
Sources: Regulation (EU) No 1007/2011 (fibre names on the sheet and the label) and ICC Incoterms 2020 for the delivery terms you will be asked to quote.
If you are building a first range sheet, send the styles and the quantity you expect. We will give you the MOQ, lead time and delivery window that belong in the footer, so the numbers on the page match what the floor can do.
Working on a knitwear project?
Let’s talk yarn, gauge and timing.
Send a reference or tech pack and we will come back with a practical development route.