The agent quoted €24 per piece and the factory quoted €27. The brand chose the agent. Six months later it discovered the agent had placed the order with that same factory, taken 8% on top, and owned the relationship — including the yarn booking, the inspection booking and the shipping file. The €3 saving was real for the first order. The dependency was the actual price.

Agents are not the problem. Not knowing which steps they own is. A sourcing agent and a direct factory relationship allocate the same work differently, and the allocation, not the commission, decides what happens when something goes wrong.

The steps, and who typically owns them

Step Direct factory Sourcing agent Where it breaks
Factory identification You shortlist; factory may refer partners Agent proposes, often from a fixed panel Agent’s panel may be small or commercially tied
Quote comparison You compare, like for like if the pack is clear Agent consolidates quotes Mark-up is invisible; comparisons are not like for like
Sampling Factory samples; you comment directly Agent coordinates comments Comments get summarised and lose precision
Yarn and trims Factory buys, usually with your approval Agent may buy or the factory may Who holds the yarn commitment?
Quality inspection Factory’s QC, plus third party if you book Agent often books inspectors Agent may choose the inspector
Shipping documents Factory prepares, forwarder files Agent coordinates Documents sit in the agent’s inbox
Payment You pay the factory You may pay the agent, who pays the factory Payment chain hides the real cost and the real terms
IP and patterns Contract between you and the factory Contract with the agent; factory may never sign Your pattern sits with a party you did not contract

Read the table as a risk map. Each “agent” cell is a place where your visibility drops, and each drop needs a document to compensate for it.

How agents charge, and what the fee does not include

Most agents charge a percentage of the order value, often somewhere between 5% and 10%, sometimes with a minimum fee per order. Some charge a retainer plus a smaller percentage; some take the margin inside the quoted price instead of showing a fee.

The fee usually covers coordination, not liability. It rarely covers:

  • the deposit you lose if the factory fails to deliver;
  • the rework cost if the inspection fails;
  • the duty or the freight, which are passed through;
  • the cost of switching factories mid-programme.

Ask what happens, in writing, when the goods fail inspection. An agent who says “we will handle it” has not answered the question.

Operators pressing finished knitwear at steam stations
Pressing is a measurement step, not a cosmetic one.

When an agent is the right call

  1. You have no presence in the country and no sourcing experience. The learning curve is real, and a good agent shortens it.
  2. You need several categories from several factories. Consolidating five suppliers into one shipment is genuine work.
  3. Your order is small and the factory will not prioritise you. An agent with ongoing volume can get you a slot you could not get alone.
  4. You need local QC. A third-party inspection plus an agent who can act on it is a real service.

When direct is better

  • You have a technical pack and know what you are buying. The coordination value drops sharply.
  • You expect to reorder. Direct relationships compound: the factory learns your fit, your measurements and your tolerance.
  • The product is technically sensitive. Gauge, structure and finishing decisions travel better without a summariser in the middle.
  • You care about IP. A direct contract with the party that holds the pattern is easier to enforce.

Five questions that reveal the arrangement

Question Good answer Warning
Which factory will produce this? A named factory, visitable “We work with several”
Can I see the factory’s quote? Yes, or a transparent cost build “Our price is all-in”
Who signs the quality spec? The factory, with the agent as coordinator Only the agent signs
Who holds the pattern and the tech pack? The factory, under an NDA you are party to “We keep everything”
What happens on a failed inspection? A defined rework or rejection process “We will negotiate”

The hybrid that usually works

Most brands end up with a mixed model: an agent or a local partner for the first order and for categories they do not buy often, and a direct relationship with the factory that makes their core product. The core is where the technical learning compounds and where the commission is easiest to justify removing.

Our sweater manufacturing page is written for the direct model: gauge range, sample process, and the points where we need a decision from the brand. If you are using an agent, send them the same page — it reduces the summarising loss, and our services overview sets out which steps we hold in-house versus coordinate with partners.

FAQ

Is an agent always more expensive?

Per unit, usually, because the commission is real. In total, not always: an agent can consolidate freight, avoid a bad factory and get you a production slot. The comparison is landed cost and risk, not the unit price.

Can I go direct after using an agent?

Often yes, and it is a normal progression. Check the agent agreement for non-circumvention clauses before you approach the factory, and expect the relationship to be tested.

Who owns the tech pack if the agent commissioned the sample?

Whoever the contract says. If there is no contract, assume the party holding the files owns the practical control. Put the ownership clause in writing before sampling.

Do I need an agent for a 300-piece order?

Not necessarily. At that size the coordination work is modest and the commission is a meaningful share of the budget. An agent earns its fee when the order is complex, multi-category, or in a country you cannot visit.

Sources: ICC Incoterms 2020 and WCO HS nomenclature for the commercial and customs steps an agent typically coordinates.

If you are deciding between the two models, send the category and the quantity. We will tell you what a direct relationship requires from you in time and documents, so the comparison includes your own hours.

Working on a knitwear project?

Let’s talk yarn, gauge and timing.

Send a reference or tech pack and we will come back with a practical development route.

Start a project
Knitwear
Back to journal