Three hundred. That number ends more first conversations than any other line in a quote, and it usually arrives as an objection rather than a question: we only need 120 to test the market.
That is a reasonable thing to want. But a factory minimum is not a sales threshold, and treating it as one pushes buyers into negotiating the wrong thing, the number instead of the three inputs that produce it. Three hundred pieces per style is the point where three floors stop pulling against each other: machine setup, dye lot, yarn order.
Here is how we arrive at 300, what the fixed side of the cost does underneath it, and which of the three floors is actually negotiable.
MOQ is a machine and dye-lot number
MOQ is the smallest quantity at which a style can run without fixed setup being spread over too few units: the machine programme, the cutting lay, the minimum dye lot. It is the higher of two floors, the machine setup floor and the dye-lot floor. Neither is a taste for large orders.
The machine floor is easy to see. A circular machine has to be set, threaded and timed before the first saleable metre comes off it; a flat-knit programme has to be written per size and proved on a swatch before anyone commits panels to yarn. That work is identical at 80 pieces and at 800, and under the floor it is charged to 80.
The dye floor is less visible and more often the real constraint. Colour is bought in lots, and a lot has a minimum because a dye vessel has one. Ask for a shade the dye house does not routinely run and the smallest economical bath may sit above your order. That is why “300 per style” and “300 per colour” are different sentences.
Why knit differs from cut-and-sew
A cut-and-sew programme can start from roll goods that already exist: fabric is bought by the metre, and the minimum is mostly a cutting-lay question. Knitwear starts one step earlier, at yarn. The garment’s shape is formed by loops on a machine rather than by a pattern cut from cloth, so gauge, stitch and programme are production decisions, not finishing details.
Two consequences follow. Yarn for a new colour has to be spun or dyed for you, and that purchase carries its own floor. And the same style at a different gauge is a different product with a different programme, closer to a new style than to a colourway. A range that looks like four pieces on a line sheet can be seven machine setups underneath.
Knitted garments also sit in HS chapter 61, woven ones in chapter 62: a different manufacturing model, not a variation.
Colour minimums vs style minimums
One style in four colours is four yarn purchases and four dye lots. The style minimum stays at 300; the colour minimum is whatever the dye house will run in that shade on that yarn. Four colours on 300 pieces is comfortable. Nine colours is nine small lots sharing one style’s setup, and the factory will decline or price the inefficiency into the garment.
| Route | What sets the floor | What moves it | Lever for the buyer |
|---|---|---|---|
| Circular-knit jersey (tees, polo bodies) | Machine setup and cutting lay | Colour count and size split | Fewer colours, more depth per colour |
| Flat-knit panels (sweaters, cardigans) | Programme per size, plus yarn lot | Gauge and stitch complexity | One gauge, one stitch family across the range |
| Yarn-dyed stripes or jacquard | Yarn minimum per colour, per count | Number of colours in the design | Fewer stripe colours, reuse a running shade |
| Piece-dyed or garment-dyed | Dye bath minimum | Shade and dye method | Accept a stock shade instead of a matched one |
Two garments, same 300. Different route, different constraint, different lever.
Route matters more than buyers expect. A jersey tee and a flat-knit cardigan can carry the same 300-piece style minimum and still arrive there by different roads.
Certified fibre adds a step. Recycled and responsibly sourced yarns, such as the GRS and RWS chains, are bought against order, and each certificate has a holder and its own lot rules.
They can also be shorter in stock than conventional yarn, which raises the colour minimum rather than the style minimum. A STANDARD 100 package and a bluesign approved dyehouse bring their own input lists to clear.
What 300 buys in machine hours
Run the arithmetic and the number stops looking arbitrary. A jersey body on a circular machine is a couple of minutes of knitting; 300 of them is roughly ten machine hours against one or two hours of setting and checking. Setup becomes a small fraction of the machine time it enables.

Flat knit behaves differently. A panel is knitted to shape and takes minutes per panel rather than seconds, so 300 sweaters hold a machine for days, and the programme has to be proved per size before the run starts.
What does not amortise is handling after knitting. Linking and mending are per-piece operations; at 300 they are simply the cost of the garment, and at 60 the same cost sits on a fifth of the units.
The cost curve below MOQ
Under the minimum, the fixed side of the cost stops being shared. It does not rise. It has fewer units to hide in. A 150-piece order is not half the total of a 300-piece order, because the same setup and the same sampling are carried by half the pieces.
Three things typically change as you go down. Yarn comes from stock rather than being dyed to your shade. Sampling is charged separately instead of absorbed, and takes 7 to 12 days once yarn and the tech pack are confirmed. And freight stops behaving like a variable: a small shipment pays nearly the same per carton, so the delivery term decides who absorbs the difference.
| Quantity | Setup per unit | Yarn purchase | Sampling | What usually happens |
|---|---|---|---|---|
| 300–500 | Spread thin | Bought to the lot | Absorbed across the run | Quoted as a normal production order |
| 150–299 | Roughly doubled | May need a stock shade | Partly absorbed | Quotable if the yarn exists |
| 60–149 | Heavy | Often a small-lot upcharge | Charged separately | Priced as a sampling run |
| Under 60 | Dominant | Stock yarn only | Charged in full | Samples, not production |
Below 300, you are buying setup. Above 300, you are buying pieces.
Splitting one MOQ across sizes
Three hundred pieces across six sizes is fifty per size, which works. Three hundred across twelve sizes is twenty-five per size, and the smallest and largest sizes are always the expensive ones: fewer units per cutting lay, more pattern work, more chance of a grading correction after the fit session.
The rule is to keep the size run to what you can sell through and put the depth in the middle of the curve, where reorders come from. Our breakdown of how a 300-piece order divides across sizes goes further into the grid arithmetic.
When factories waive it
Minimums move for reasons that have nothing to do with persuasion. The yarn may already exist in your shade, because another order ran it. The style may have run before, so programme and measurements are proved. Or the order may be a sampling run whose units convert to bulk once fit is signed off.
A waived minimum is usually a minimum that has moved onto someone else’s inventory, and that sets its condition: a stock shade can ship lower, the same style in a matched shade cannot. It is also why a low-minimum capsule programme is built around a fixed palette and a fixed gauge: the constraints are what make the small run possible.
Questions that reveal a real minimum
Most MOQ confusion comes from a number quoted without its unit. Ask these six before you plan a range around it.
- Is the 300 per style, per colour, or per yarn count?
- Does it count samples, or is it 300 saleable pieces?
- Does the number change if I accept a stock shade?
- Is sampling charged separately, and does it convert into bulk?
- If I split 300 across sizes, is there a per-size floor?
- At reorder, does the minimum stay at 300 or drop?

Someone who answers all six without pausing has a real minimum. Someone who says “it depends” and stops there is telling you the number is a negotiation position. Send the style with its colour count and size split, and we will tell you which floor your order hits, and whether a smaller first run is possible on the yarn you want.
FAQ
Is the 300-piece minimum per style or per colour?
Per style. Underneath it sits a dye-lot minimum per colour, so 300 pieces in three colours is comfortable while 300 in nine colours is nine small lots and usually re-priced. Always ask which unit a quoted minimum refers to.
Can I order 300 pieces split across several colours?
Yes, provided each colour clears its own dye-lot minimum. Four to six colours on a 300-piece style is normal. Beyond that, the run is better split into two drops so each colour gets enough depth to be dyed economically.
Does the minimum drop on a repeat order?
Often, but not always. The programme, measurements and yarn source already exist on a repeat, which removes part of the setup floor. The dye-lot floor stays, because a new colour still needs a new lot.
What has to be confirmed before sampling starts?
Yarn and the tech pack. Once both are confirmed we run samples in 7–12 days, and bulk production follows in 20–35 days after sample approval, with inspection at AQL 2.5.