Three hundred pieces per style is the minimum at Horssle Knit, and it is where most cost conversations start. It is also the wrong place to start. At that quantity a sweater’s unit cost is set by its weight in grams, the gauge it is knitted on and the number of panels it is cut into, long before order size enters the arithmetic.
None of those three is a price, and a sweater manufacturing cost breakdown starts by treating them as quantities. A factory turns them into price only after the yarn, the machine time and the finishing have been counted, which is why a breakdown can be compared line by line and a single number cannot.
Sweater manufacturing cost breakdown: the short answer
A sweater manufacturing cost breakdown has five lines: yarn consumption times yarn price, knitting and machine time, make-up and trims, finishing and washing, and packing with freight. Each line is driven by the specification rather than the order size, so the useful question is not what the sweater costs but which decision moves it.
That question is answerable before a price exists, which is why the breakdown is worth building at the sampling stage rather than after the first quotation.
Three hundred pieces is the wrong place to start
Order size matters, and it matters less than buyers expect. What an order size does is spread fixed work — programming, sampling, setting up a colour, packing a carton — across more pieces. What it does not do is make a heavy cable sweater cost the same as a light plain one.
The specification decides the variable lines, and the variable lines are the ones that persist at any quantity. A buyer who wants a lower unit cost usually has two honest levers: change the specification, or move the fixed work off the order by reordering a style that is already developed.
The build, step by step
A cost is built in the same order a garment is made. Each step fixes something the next step has to live with, and each one has a document that should exist before the quote does.
| Step | What is fixed | What it does to the unit cost | Document to confirm |
|---|---|---|---|
| Tech pack and bill of materials | Construction, gauge, panel count | Sets every line that follows | Measurement sheet and sealed swatch |
| Yarn specification | Fibre, count and ply, dye route | The largest variable line on most wool and cashmere styles | Yarn ticket with lot reference |
| Yarn consumption | Grams per garment, plus waste | Weight multiplied by yarn price | Weight sheet by size |
| Knitting time | Gauge, stitch, panel shaping | Machine minutes per panel | Gauge and machine list |
| Make-up | Linking, seams, trims | Labour per garment | Construction notes |
| Finishing | Wash, press, mending | Handling per garment | Finishing route and care claim |
| Packing and freight | Polybags, cartons, Incoterm | Cost per shipment rather than per stitch | Packing list and shipping terms |
The table explains why two quotes for “the same sweater” diverge. They are rarely the same sweater at step two, and everything downstream inherits the difference.
Yarn: the line that moves most
Yarn cost is consumption multiplied by price per kilogram, and both halves are decided by the brief. Consumption comes from the finished weight plus knitting waste; a garment graded across sizes consumes more in the larger sizes, and a cable or links structure consumes more than a plain knit at the same gauge.
Price per kilogram is driven by fibre, count and ply, dye route, lot size and documentation. A finer count costs more to spin. Yarn-dyed colour costs more than piece-dyed because the yarn is coloured before knitting. A certified lot — OEKO-TEX Standard 100, GRS or RWS by requirement — may only be available in certain volumes, and the traceability documents have to travel with it. A cashmere programme sits at the far end of this line, where fibre length and diameter move the price faster than quantity ever will.
Machine time: gauge, stitch and shaping
Machine time is minutes per panel, and minutes per panel are set by stitch count. A finer gauge puts more stitches into the same centimetre, so each panel takes longer even though it weighs less. That is the counter-intuitive part of sweater costing: the lighter garment is not always the cheaper one.
Stitch structure compounds it. Cables and links run the machine slower and use more yarn, so a cable panel is a double charge on the same square centimetre. Fully fashioned panels are shaped on the machine, which adds knitting time but removes cutting waste and make-up work; cut-and-sew panels are faster to knit and slower to assemble.
A crewneck programme shows the effect clearly. Change the neckline rib from a narrow band to a deep rib and both yarn and minutes move, on a garment whose silhouette has not changed at all.

Make-up, trims and finishing
Make-up is the labour that turns panels into a garment: linking at the shoulders and sides, seams, mending, pressing. Trims are small lines that add up: buttons for a cardigan, zips, woven or printed labels, care labels, hangtags. None of them is expensive on its own; all of them are counted per piece.
Finishing is the line buyers underestimate. Washing and softening change the handle and therefore the quality, and each garment passes through handling that cannot be spread across a batch. Pressing and drying under tension decide the final measurements. A supplier that quotes finishing as a percentage of something rather than as handling per garment has not costed it properly.
MOQ and colour splits
Our published minimum is 300 pieces per style, and the fixed work behind that number is real: programming a knitting programme, knitting a sample, approving a colour, setting up packing. Spread over 300 pieces it is one thing; over 1,500 it is another, which is why a repeat order costs less per piece than a first order of the same style.
Colour is the second fixed cost. The dyer has a minimum per colour, and a yarn-dyed programme carries that minimum in yarn. Splitting 300 pieces across six colourways can cost more per piece than 300 pieces in two, even though the garment is identical. Ask for the colour minimum in writing and price the split before the range is signed off.
What a sweater quote should state
A quote is a document, not a number. These are the fields that make it comparable with another supplier’s.
| Field | What it should state | What an omission hides |
|---|---|---|
| Price basis | Per piece or per unit, and the Incoterm | Whether freight and duty sit inside the number |
| Yarn assumed | Fibre, count and ply, dye route | A cheaper yarn than the sample was made in |
| Gauge and stitch | The machine and structure being costed | A coarser gauge than the brief asked for |
| Construction | Fully fashioned or cut-and-sew panels | Extra make-up labour and waste |
| MOQ and colour minimum | Pieces per style and per colour | A price that only holds at a larger split |
| Sampling | Charge, and whether it is credited on bulk | Development cost that reappears later |
| Testing and certification | Which tests, and who pays | Compliance cost discovered at shipment |
| Validity | How long the price holds, and against what | A yarn price that moves with the market |
What to send for a comparable quote
Two quotes can only be compared if both suppliers costed the same brief. Send these seven items, and ask each supplier to confirm which ones they assumed.
- Tech pack, or a reference garment with the changes marked.
- Target quantity per style, and the colour split.
- Yarn direction: fibre, count and ply, or a swatch.
- Gauge and stitch structure.
- Trims, labels and packaging.
- Destination market and Incoterm.
- Test and certification requirements.
A supplier who answers with a price and no questions has either assumed the missing fields or ignored them. Both are worth knowing before the sample is knitted. The sweater manufacturing programme at Horssle Knit runs from yarn selection to AQL 2.5 inspection, and a merino brief is the simplest place to test whether the cost lines are being read the same way on both sides.

FAQ
Why do two quotes for the same sweater differ?
Usually because they are costing different sweaters. Different yarn, gauge, panel construction, colour split or Incoterm will all move the price. Ask each supplier to state the yarn and construction assumed before comparing the numbers.
Does a larger order always lower the unit cost?
No. It spreads fixed work and can improve the colour position, but the variable lines stay where they were. A larger order in a harder specification can still cost more per piece than a smaller order in a simple one.
Is cashmere expensive only because of the fibre?
No. The fibre is the biggest single reason, but fine-gauge knitting time, lower yields on very soft yarns and the testing that a cashmere claim needs all contribute. Two cashmere sweaters can sit far apart on cost without either fibre being misdescribed.
What should a quote include besides the unit price?
Price basis and Incoterm, the yarn and construction assumed, MOQ and colour minimums, sampling charges, testing and certification, packing, payment terms and how long the price holds. A number without those fields cannot be compared.
Sources: The Woolmark Company, OEKO-TEX Standard 100, Intertek, EU Regulation 1007/2011, Higg and Control Union.
Working on a knitwear project?
Let’s talk yarn, gauge and timing.
Send a reference or tech pack and we will come back with a practical development route.