Asking a factory to go lower on minimum order quantity is the fastest way to raise the unit price. Not as punishment for a small order, but because a knitwear minimum is assembled from three fixed blocks, and dividing a fixed block by fewer pieces does not make the block smaller.

The blocks are the yarn lot, the dye bath and the machine set-up. Each has a floor set by the equipment and by the supplier one step upstream, and those floors are what a factory quotes when it says three hundred pieces per style. The number is negotiable at the edges and immovable at the base.

The inputs nobody lists

A minimum order quantity is the smallest run per style and colour at which a knitwear factory can cover a yarn lot, a dye bath and a machine set-up without losing money on the fixed part. It is calculated from those three blocks plus sampling, not chosen from a price list.

Most minimum conversations open with a number and end in a discount argument, because neither side separates fixed from variable. A quote is a ratio: fixed blocks divided by units, plus material and labour per unit. Change the denominator and the ratio moves; change the numerator and it moves faster. Two suppliers quoting different minimums are usually quoting different numerators, so the useful question is never “what is your minimum” but “what is your minimum made of”.

Yarn minimum per colour

Yarn arrives with two constraints, and buyers usually hear only the first. A spinner runs a lot per yarn count and fibre, so a small order draws on stock yarn or waits for the next lot. Then the dye house runs a bath per colour, and a bath has a volume below which the shade stops holding across the lot.

Colour count is a multiplier, not an addition. One style in one colour is one yarn commitment and one bath; the same style in four colours is four baths, four lab dips and four chances for a shade to drift.

That is why “three hundred pieces” can mean three hundred in total or three hundred per colour, and why the distinction belongs in writing. Certified yarns add arithmetic: a certified lot arrives with transaction certificates tying a quantity of yarn to one order, and the Textile Exchange standards describe how those chains are built.

Certified lots stay traceable, and they are not divisible at will.

Machine time per dozen

Knitting is not a continuous process that begins when yarn arrives. Every style carries a set-up: the machine programme and the linking table, plus threads matched to the colour and time at the press. Each size in a graded set can need its own programme, and each colour needs its threads changed.

The economics are blunt at the start of a run. The first dozen pieces can absorb as much machine attention as the next five, because set-up is paid once and production is paid per piece. Three hundred pieces in four sizes spreads that set-up across a defensible number of units; the same three hundred across four colourways does not, because every colour change stops the line.

Sampling amortisation

Sampling is a fixed cost of the style before a single bulk piece exists. With us it runs seven to twelve days after yarn and the tech pack are confirmed, and it usually takes more than one round: a prototype, a fit sample, then a pre-production sample that locks construction. Each round consumes pattern work, yarn and a courier.

The cost does not disappear on a small order; it stops being spread. On a short run it sits heavily on every unit, on a long run it flattens to almost nothing. A factory that appears to skip sampling has either absorbed the cost into the unit price or decided not to do it, and the second option reaches you later as a fit problem in bulk. Ask who pays per round, and what happens on round three.

Working the number down

There are real levers, and each trades something. Treating a lower minimum as a discount rather than as a change to the order is where the argument goes wrong.

Levers that lower a minimum, and what each one costs
Lever What it moves What you give up
Consolidate to fewer colours Dye baths and lab dips Range breadth at launch
Choose a yarn already in stock Yarn lot commitment Fibre or shade choice
Put two styles on one yarn count A single shared yarn lot Design freedom, and a joint calendar
Keep one size ratio across the run Machine set-ups per size Size availability at the edges
Accept a longer ship window Scheduling flexibility for the factory Speed to market
Combine with a repeat style Set-up amortisation Cash committed to one decision
Pay for sampling separately Unit price loading An upfront cost, for visibility

Two levers are usually enough. Cut from five colours to three, use a stock yarn, accept a longer window, and the workable total often lands below the first quote, because the fixed blocks shrank rather than the price. What never works is asking for the same complexity at a smaller volume.

A shorter run spreads the same set-up over fewer units.

What a factory will not go below

Three floors are structural. A dye bath has a working volume below which a shade cannot be held. A spinner has a lot size per count. A knitting programme costs the same set-up whether it runs one hour or ten. None is a negotiating position; they are the shape of the equipment.

Two more are commercial. Testing is charged per colourway, and a claim behind a label mark needs a test on the material actually used — an OEKO-TEX certificate covers what it names, not everything produced in the same building. A dye house on a restricted chemistry list keeps its own approved ranges, which is where a bluesign requirement can push a small colour run back up. Inspection is the last floor: a very small lot gives the inspector little to sample and the buyer little protection.

Comparing two quotes at different MOQ

Two quotes at different quantities are not comparable as sent.

Fix the scope first: same style, fibre, colour count and size ratio. Price sampling per round, and convert both quotes to a per-unit figure at the quantity you will actually buy. Put freight and duty on one basis — the ICC Incoterms 2020 rules define the handover point, and duty follows classification under the WCO Harmonized System. Price the payment terms, then put a number on colour risk: a lot that has to be re-dyed is not a saving.

A normalisation sheet for two quotes at different quantities
Line Quote A Quote B How to normalise
Quantity and colour count As quoted As quoted Rewrite both at the same units and colours
Sampling Stated or hidden Stated or hidden Price it separately, per round
Unit price at your real quantity Tier price Tier price Recalculate outside the ladder
Pack and carton build Included or not Included or not Add repack cost if specs differ
Incoterm and freight Named term Named term Convert both to the same term
Payment terms Deposit and balance Deposit and balance Cost the capital difference
Colour risk Lab dip ownership Lab dip ownership Add the cost of one re-dye

Filled in, the quotes usually converge, or one reveals the real exclusion.

Request for quotation form listing style, colour count and target quantity for a knit order
A quote is only comparable when quantity, colour count and scope sit on the same line.

A spreadsheet you can copy

The model fits in a spreadsheet: one column per style, one row per input, fixed blocks kept apart from per-unit lines.

  • Units by size, and the ratio you intend to sell
  • Colour count, with a row per colourway
  • Yarn consumption per unit, plus a wastage allowance
  • Yarn lot size and dye bath volume, asked of the mill
  • Set-up minutes per size and per colour change
  • Sampling rounds, and who pays for each
  • Testing per colourway, and the certificate it supports
  • Packing, carton build and any repack at the warehouse
  • Freight, duty basis and the Incoterm the quote sits on
  • Deposit, balance timing and the cost of carrying both

Filled once, the conversation changes shape: you stop asking for a lower minimum and start asking which block is driving it. Our explanation of why the minimum is 300 pieces covers the machine and dye-lot side. The low MOQ capsule approach suits a first season across several styles. The document that carries settled quantities to a buyer is a line sheet with the right fields.

Send the target quantity and colour count to the services team and we will tell you which block is setting the floor.

Knitted panels laid out beside a knitting programme sheet before a production run
Set-up happens once per style, per size and per colour change — the part of a minimum that no discount removes.

FAQ

Isn’t a lower minimum always better for a new brand?

No. Below the yarn and dye floor the fixed cost does not vanish; it moves into the unit price or into colour risk. A small first order that produces a shade you cannot sell costs more than a larger one that sells.

Can’t one minimum be split across several styles?

Only when the styles share a yarn count and a colour. Splitting 300 pieces across three styles in three colours triples the dye baths and defeats the point of the split.

Does paying a higher unit price remove the minimum?

Rarely. A higher price can absorb sampling and set-up, but it cannot buy a dye bath below its working volume or a spinner below its lot size.

Is the minimum per style or per colour?

Per style with us: 300 pieces per style. The colour count then decides whether that number is workable, because each colourway brings its own dye bath and its own test.

Working on a knitwear project?

Let’s talk yarn, gauge and timing.

Send a reference or tech pack and we will come back with a practical development route.

Start a project
Knitwear
Back to journal